Skip to content
Robotlar
Concept scenario

Sapling Height and Growth Rate LiDAR Tracking

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Supervised autonomy
Proposed robot
Unitree A2

The problem addressed

Impossibility of manually measuring growth tracking of thousands of saplings in large forestry areas.

Draft mission flow

  1. 1The robot walks autonomously between sapling rows in the afforestation area; measures each sapling's height and trunk diameter with centimeter precision via LiDAR.
  2. 2Growth rate curves generated from periodic measurements; saplings growing slower than expected flagged as stress risk.
  3. 3Leaf health and disease symptoms evaluated with RGB camera; drying or decaying saplings reported.
  4. 4Site report transmitted to forestry information system; biomass data provided to carbon credit calculation platform.

Proposed hardware

  • 3D LiDAR
  • HD RGB Camera
  • RTK-GPS
  • NVIDIA Jetson Orin NX

Proposed software

Navigation
Terrain-adaptive autonomous navigation between afforestation area rows
Model
Sapling Height/Trunk Diameter 3D Measurement and Growth Rate Trend Analysis
Integration
Forestry Information System (GDF) and Carbon Credit Calculation Platform

The robot's real operating limits

Unitree A2

Unitree A2

Industrial Class Legged Robot

Product page
Ingress rating
IP56-IP67
Runtime
>5 hours (No load) / >3 hours (25kg Load)
Operating temperature
-20°C to 55°C
Payload
100 kg
Max speed
5 m/s
Climb
45°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.