Pressing squeegee and roller to the floor at constant force
On an epoxy floor the primer, intermediate and top coats are pulled by hand with squeegee and roller; coat thickness and consumption vary by applicator, and on large areas lap marks and thickness differences appear. The Floor Coating Robot carries squeegee (3.2 m) and roller (3.8 m) end tools on a modular design; dynamic adaptive constant-force control keeps the tool fitted to the surface under different floor conditions and spreads the coating uniformly across the whole area. Process parameters come preset from the app and consumption is controlled within ±15 percent; the operator drives the chassis and loads material, the arm's coating is automatic.
Three hundred an hour, two thousand a shift
With a 3.8 m roller width and 0.7 m/s speed the net output is 300 m² per hour and 2,000 m² per shift. The 48 V 100 Ah battery runs more than 6 hours and charges from an AC 220 V / 16 A socket; 3.0 kW rated power, 12° climbing and 50 mm obstacle and trench crossing cover car park ramps and joint lines. The 32 L material tank works with oil- and water-based coatings; job data statistics and FMS cloud data management report consumption and progress.
Application scenarios
- Underground parking garage: primer, intermediate coat and top coat on large garage floors.
- Factory and industrial plant: epoxy, resin and other industrial floor systems.
- Warehouse and logistics centre: continuous coating work, speed and quality.
- Laboratory and clean area: standardised operation and smooth finish.
- Sports venue and public building floors.
Figures from the field
- Lake City, Kuala Lumpur (December 2022): the floor coating robot completed primer, intermediate and top coat automatically; average net output 300 m² per hour, above manual application on large areas. With the floor grinding robot, base grinding, primer, intermediate and top coat of the epoxy floor and grinding and polishing of the densifier floor were all done by robot.
Who it is for
For flooring companies and contractors doing car park, factory, warehouse and commercial building floors; on the base prepared by the Floor Grinding Robot the same crew runs primer, intermediate and top coat. The choice is based on project area, coating material, process, working width, battery endurance and site conditions; squeegee, roller and epoxy applications are all covered by one machine.
Price and sourcing
The Zemin Kaplama Robotu is sourced for Turkey on a project basis; import, customs clearance, commissioning and operator training are part of delivery. Investment is set by corporate quotation against edition, configuration, spare and wear-part provisioning, training scope and quantity. Request a quotation with your project profile.
Summary
The Floor Coating Robot spreads the three coats of an epoxy floor uniformly with constant-force squeegee and roller: 3.8 m width, 300 m² per hour, 2,000 m² per shift, ±15 percent consumption control and 6 hours of battery. At Lake City in Kuala Lumpur it completed every step of the epoxy floor by robot together with the grinding robot. For companies doing car park, factory and warehouse floors, request a quotation with your project area and coating system.