Skip to content
Robotlar
Concept scenario

Water Basin and Dam Pollution Autonomous Monitoring

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Supervised autonomy
Proposed robot
Unitree A2

The problem addressed

Illegal and invisible industrial toxic discharges made to dam banks.

Draft mission flow

  1. 1The robot makes periodic fast drives around the water basin.
  2. 2Detects illegal factory waste discharges with its multi-spectral camera.
  3. 3Reports regional algal bloom or deoxygenation levels to the center.

Proposed hardware

  • Multi-spectral Camera
  • Soil/Water pH Measurement Module
  • Broadband Communication Set

Proposed software

Navigation
Wheeled linear patrol on dam lake and river banks
Model
Chemical Waste Leak and Algal Bloom (Algae) Detection
Integration
Ministry of Environment and Urbanization Integrated Data Network

The robot's real operating limits

Unitree A2

Unitree A2

Industrial Class Legged Robot

Product page
Ingress rating
IP56-IP67
Runtime
>5 hours (No load) / >3 hours (25kg Load)
Operating temperature
-20°C to 55°C
Payload
100 kg
Max speed
5 m/s
Climb
45°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.