Structural Risk Pre-Assessment Scanning in Urban Renewal Zones

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Teleoperation
Proposed robot
Unitree B2-W

The problem addressed

Urban renewal prioritization depends on slow, subjective engineer assessments, delaying decisions on which buildings need action first.

Draft mission flow

  1. 1Robot kentsel dönüşüm adayı binaların dış cephelerini sokak seviyesinden LiDAR ve HD kamerayla tarar.
  2. 2Cephe çatlakları, duvar eğilmeleri ve yapısal simetri bozulmaları milimetrik hassasiyetle ölçülür ve puanlanır.
  3. 3Termal kamerayla duvar içi nem birikimi ve izolasyon kaybı tespit edilerek yapısal risk haritasına eklenir.
  4. 4Her bina için yeşil/sarı/kırmızı risk sınıfı belirlenerek belediye kentsel dönüşüm önceliklendirme raporuna aktarılır.

Proposed hardware

  • 3D LiDAR
  • HD Zoom Kamera
  • Termal Kamera
  • Tilt/İnklinometre Sensörü
  • Çatlak Genişlik Ölçer

Proposed software

Navigation
Dar sokak ve eski bina çevresinde dış cephe tarama odaklı güvenli otonom navigasyon
Model
Bina Cephe Çatlak Segmentasyonu, Eğilme/Çökme Risk Puanlaması ve Yapısal Simetri Bozulma Analizi
Integration
Belediye İmar ve Kentsel Dönüşüm Müdürlüğü ve AFAD Risk Haritası

The robot's real operating limits

Unitree B2-W

Unitree B2-W

Superior Endurance, High Logistics Efficiency

Product page
Ingress rating
IP67
Operating temperature
-20°C to 55°C
Payload
120 kg
Max speed
15
Climb
45°
Weight
85 kg

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.