Skip to content
Robotlar
Concept scenario

Occupational Safety PPE (Helmet/Vest) Inspection and Voice Warning

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Supervised autonomy
Proposed robot
Unitree A2

The problem addressed

OHS inspectors unable to monitor entire site simultaneously; workplace accidents and legal penalties from OHS violations.

Draft mission flow

  1. 1The robot continuously patrols active work zones on the construction site; AI camera checks each worker's PPE status in real-time.
  2. 2Polite but firm voice warning given via speaker to workers detected without hard hat, vest, or safety harness.
  3. 3Violation moment photograph, location, and timestamp instantly reported to OHS portal; repeat violator personnel flagged.
  4. 4Daily and weekly PPE compliance score generated; riskiest zones and hours analyzed to determine OHS training needs.

Proposed hardware

  • HD Optical Camera
  • NVIDIA Jetson Orin NX
  • High Decibel Speaker
  • LED Warning Lights

Proposed software

Navigation
Dynamic SLAM avoiding workers and construction equipment in active work zones
Model
PPE Detection: Hard Hat, Vest, Goggles, Gloves, Safety Harness Classification (YOLOv8-PPE)
Integration
OHS Digital Compliance Portal and Personnel ID System

The robot's real operating limits

Unitree A2

Unitree A2

Industrial Class Legged Robot

Product page
Ingress rating
IP56-IP67
Runtime
>5 hours (No load) / >3 hours (25kg Load)
Operating temperature
-20°C to 55°C
Payload
100 kg
Max speed
5 m/s
Climb
45°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.