Post-Pour Concrete Curing Thermal Monitoring

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Supervised autonomy
Proposed robot
Unitree B2

The problem addressed

Concrete curing monitoring dependent on manual temperature measurement; low concrete strength from insufficient curing.

Draft mission flow

  1. 1After concrete pour, the robot patrols along the slab edge; measures concrete hydration heat profile hourly with thermal camera.
  2. 2Checks whether curing temperature is distributed homogeneously; cold or overheated zones flagged as 'crack risk'.
  3. 3Monitors ambient humidity with moisture sensor to evaluate whether suitable conditions for curing are maintained.
  4. 4Hourly thermal profile and curing score reported to concrete laboratory; areas requiring water curing automatically notified.

Proposed hardware

  • Radiometric Thermal Camera
  • Humidity/Temperature Sensor
  • RTK-GPS
  • WiFi 6E Communication

Proposed software

Navigation
Safe SLAM navigation along perimeter edges without stepping on fresh concrete surface
Model
Concrete Hydration Heat Profile Analysis and Curing Homogeneity Score
Integration
Construction Site Management Platform and Concrete Laboratory Quality System

The robot's real operating limits

Unitree B2

Unitree B2

Leading Industrial Application

Product page
Ingress rating
IP67
Runtime
>5 hours (No load) / >4 hours (20kg Load)
Operating temperature
-20°C to 55°C
Payload
120 kg
Max speed
>6 m/s
Climb
45°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.