Open Pit and Trench Hazard Marking Patrol

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Supervised autonomy
Proposed robot
Unitree A2

The problem addressed

Excavation pits changing daily on construction sites and unbarriered areas causing fall accidents.

Draft mission flow

  1. 1The robot patrols autonomously on the construction site, detecting open pits, trenches, and unbarriered elevation differences with LiDAR and depth camera.
  2. 2Depth, width, and perimeter barrier status of each hazardous area evaluated; unbarriered areas scored as 'urgent risk'.
  3. 3Instant LED warning and siren alert given to personnel approaching hazardous area; location and photo notification sent to OHS platform.
  4. 4Daily hazard map updated and presented to site manager at morning briefing; barrier deficiency opened as work order.

Proposed hardware

  • 3D LiDAR
  • HD Depth Camera
  • LED Warning Lights
  • High Decibel Siren

Proposed software

Navigation
Safe SLAM navigation with edge detection around excavation areas
Model
Open Pit Depth Estimation and Unbarriered Hazardous Area Segmentation
Integration
Construction Site OHS Platform and Daily Hazard Map

The robot's real operating limits

Unitree A2

Unitree A2

Industrial Class Legged Robot

Product page
Ingress rating
IP56-IP67
Runtime
>5 hours (No load) / >3 hours (25kg Load)
Operating temperature
-20°C to 55°C
Payload
100 kg
Max speed
5 m/s
Climb
45°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.