Skip to content
Robotlar
Concept scenario

Underground Shelter and Tunnel Security Inspection

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Supervised autonomy
Proposed robot
Unitree A2

The problem addressed

Inability to periodically inspect thousands of underground shelters due to personnel and time constraints.

Draft mission flow

  1. 1The robot enters shelter and tunnel systems, conducting autonomous reconnaissance in darkness with night vision and LiDAR.
  2. 2Detects structural cracks, water seepage, and collapse risk areas; measures air quality with gas detector.
  3. 3Shelter usability status (door functionality, ventilation, capacity) evaluated.
  4. 4Detailed maintenance report presented to civil defense directorate; areas requiring urgent maintenance prioritized.

Proposed hardware

  • HD Night Vision Camera
  • Multi-Gas Detector (O₂/CO/CH₄)
  • LiDAR L2
  • Tactical Communication

Proposed software

Navigation
LiDAR-based corridor SLAM without illumination in narrow tunnels and shelter corridors
Model
Structural Damage Detection (Crack, Water Seepage, Collapse Risk) and Air Quality Assessment
Integration
Civil Defense Directorate and Municipal Infrastructure Management System

The robot's real operating limits

Unitree A2

Unitree A2

Industrial Class Legged Robot

Product page
Ingress rating
IP56-IP67
Runtime
>5 hours (No load) / >3 hours (25kg Load)
Operating temperature
-20°C to 55°C
Payload
100 kg
Max speed
5 m/s
Climb
45°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.