Museum and Historical Artifact Humidity/Temperature Protection Monitoring
Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.
- Environment
- Indoor, public area
- Operating mode
- Supervised autonomy
- Proposed robot
- Unitree AS2
The problem addressed
Priceless historical artifacts silently degrading under improper environmental conditions.
Draft mission flow
- 1The robot patrols autonomously around display cases in museum galleries; measures temperature, humidity, and UV exposure of each gallery.
- 2Comparison made with ideal conditions based on artifact material type (wood, fabric, metal, paper); deviation risk determined.
- 3Critical changes like sudden humidity increase, UV exposure rise reported instantly to museum collection management.
- 4Gallery-level optimization recommendation transmitted to HVAC system; seasonal protection strategy determined.
Proposed hardware
- High Precision Humidity/Temperature Sensor (±0.1°C/±0.5%RH)
- UV Light Meter
- LiDAR L2
- WiFi 6E
Proposed software
- Navigation
- Sensitive exhibit-protected SLAM in museum galleries and display areas
- Model
- Micro-Climate Anomaly Detection and Risk Classification by Artifact Material Type
- Integration
- Museum Collection Management System and HVAC Automation
The robot's real operating limits

Unitree AS2
Industrial Capacity in a Compact Chassis
Product page- Ingress rating
- IP54
- Runtime
- >4 hours (No load)
- Operating temperature
- -20°C to 50°C
- Payload
- Up to 65 kg
- Max speed
- >5 m/s
- Climb
- 40°
Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.
From scenario to installation
Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.





























































