City Sewage Blockage Prediction and Early Warning

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Supervised autonomy
Proposed robot
Unitree A2

The problem addressed

Sewer blockages turning into floods and environmental disasters without detection.

Draft mission flow

  1. 1The robot descends into sewer manholes and scans inner walls of large diameter collectors with endoscopic camera.
  2. 2Detects blockage precursors such as grease buildup, root intrusion, collapse, and sand accumulation.
  3. 3Measures current fill rate and flow speed with ultrasonic flow sensor; blockage prediction algorithm executed.
  4. 4Blockage risk map transmitted to SCADA system; points requiring urgent cleaning before rain prioritized.

Proposed hardware

  • IP68 Waterproof Body
  • HD Endoscopic Camera
  • Ultrasonic Flow Sensor
  • H₂S/CH₄ Gas Detector

Proposed software

Navigation
Water-edge safe SLAM in sewer manholes and large diameter collectors
Model
In-Pipe Blockage/Collapse Detection, Flow Speed Anomaly and Fill Rate Prediction
Integration
Municipal Infrastructure Management System (SCADA) and Flood Early Warning Network

The robot's real operating limits

Unitree A2

Unitree A2

Industrial Class Legged Robot

Product page
Ingress rating
IP56-IP67
Runtime
>5 hours (No load) / >3 hours (25kg Load)
Operating temperature
-20°C to 55°C
Payload
100 kg
Max speed
5 m/s
Climb
45°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.