Concept scenario

University Campus Night Security and Lighting Control Patrol

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Indoor, public area
Operating mode
Supervised autonomy
Proposed robot
Unitree AS2

The problem addressed

Night security gaps, dark spots, and non-functioning emergency call points on campuses.

Draft mission flow

  1. 1The robot patrols autonomously across campus throughout the night; performs security monitoring with thermal and night vision cameras.
  2. 2Checks walkway and parking lot lighting levels with lux meter; maps dark spots.
  3. 3Verifies operational status of malfunctioning lighting poles and SOS emergency call points.
  4. 4Instant status report transmitted to security center; extinguished lighting automatically activated through smart system.

Proposed hardware

  • Radiometric Thermal Camera
  • HD Night Vision Camera
  • Lux Meter
  • High Decibel Siren

Proposed software

Navigation
Night autonomous patrol SLAM on campus walkways, parking lots, and building perimeters
Model
Suspicious Behavior Detection, Dark Area Mapping, and SOS Call Point Verification
Integration
University Security Center and Smart Campus Lighting System

The robot's real operating limits

Unitree AS2

Unitree AS2

Industrial Capacity in a Compact Chassis

Product page
Ingress rating
IP54
Runtime
>4 hours (No load)
Operating temperature
-20°C to 50°C
Payload
Up to 65 kg
Max speed
>5 m/s
Climb
40°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.