Skip to content
Robotlar
Concept scenario

CNC Machine Oil Leak and Under-Machine Visual Inspection

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Teleoperation
Proposed robot
Unitree A2

The problem addressed

Machine damage and production quality decline from late detection of oil leaks under CNC machines.

Draft mission flow

  1. 1The compact Go2 robot enters under CNC machines and scans surfaces invisible to humans under UV fluorescent light.
  2. 2UV lighting distinguishes hydraulic oil, lubricant, and coolant stains by different fluorescent colors.
  3. 3Leak size, spread rate, and source type classified by AI; machine-specific leak profile generated.
  4. 4Maintenance work order automatically opened in CMMS for the relevant CNC machine; machine shutdown recommendation transmitted to MES if leak severity is critical.

Proposed hardware

  • HD Macro Camera
  • UV Fluorescent Lighting
  • Moisture Sensor
  • Compact 2D LiDAR

Proposed software

Navigation
Compact SLAM navigating under CNC machines with low-profile (15cm height) obstacle clearance
Model
Oil Stain Segmentation and Leak Source Classification (Hydraulic/Lubrication/Coolant)
Integration
MES and CMMS Maintenance Planning Integration

The robot's real operating limits

Unitree A2

Unitree A2

Industrial Class Legged Robot

Product page
Ingress rating
IP56-IP67
Runtime
>5 hours (No load) / >3 hours (25kg Load)
Operating temperature
-20°C to 55°C
Payload
100 kg
Max speed
5 m/s
Climb
45°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.