Steel Construction Hard-to-Reach Weld Point Inspection

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Supervised autonomy
Proposed robot
Unitree A2

The problem addressed

Scaffolding cost and time loss for inspecting hard-to-reach weld points; risk of incomplete NDT inspection.

Draft mission flow

  1. 1The robot enters between steel constructions inaccessible to humans without scaffolding and photographs weld points up close.
  2. 2Detects porosity, cracks, and undercut defects in weld seams at micron level with 100MP macro camera.
  3. 3Ultrasonic thickness gauge verifies weld penetration depth; non-standard welds reported.
  4. 4All findings transmitted to NDT reporting system with photographs, location, and defect class; corrective welding work order auto-opened.

Proposed hardware

  • 100MP Macro Optical Camera
  • Ultrasonic Thickness Gauge
  • Lighting Kit
  • Long Range WiFi 6E

Proposed software

Navigation
Adaptive SLAM in narrow passages and under stairs among steel constructions
Model
Weld Seam Porosity, Crack and Insufficient Penetration Classification (Custom CNN)
Integration
Structural Engineering NDT (Non-Destructive Testing) Reporting System

The robot's real operating limits

Unitree A2

Unitree A2

Industrial Class Legged Robot

Product page
Ingress rating
IP56-IP67
Runtime
>5 hours (No load) / >3 hours (25kg Load)
Operating temperature
-20°C to 55°C
Payload
100 kg
Max speed
5 m/s
Climb
45°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.