Skip to content
Robotlar
Concept scenario

Railway Track Gap and Switch Measurement

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Teleoperation
Proposed robot
Unitree B2-W

The problem addressed

Slowness of traditional pedestrian railway inspection and human measurement errors.

Draft mission flow

  1. 1Travels for kilometers on/near rails in wheeled mode.
  2. 2Measures expansion gaps at rail joints and mechanical wear at switches millimetrically with LiDAR.
  3. 3Sends points exceeding critical tolerance to the maintenance department with geographic tags.

Proposed hardware

  • Millimetric Profile LiDAR
  • Dual Optical Camera
  • RTK GPS

Proposed software

Navigation
High-speed wheeled autonomous travel on the rail line
Model
Rail Expansion and Structural Wear Analysis Algorithm
Integration
Railway Signaling and Maintenance Network

The robot's real operating limits

Unitree B2-W

Unitree B2-W

Superior Endurance, High Logistics Efficiency

Product page
Ingress rating
IP67
Operating temperature
-20°C to 55°C
Payload
120 kg
Max speed
15
Climb
45°
Weight
85 kg

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.