Skip to content
Robotlar
Concept scenario

Chemical Ship Hold Leak and Corrosion Control

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Teleoperation
Proposed robot
Unitree A2

The problem addressed

Chemical poisoning risks and leaks leading to heavy fines in maritime.

Draft mission flow

  1. 1The robot is lowered into holds that may be toxic for humans after loading.
  2. 2B2 performs chemical leak and corrosion detection by descending stairs inside the hold.
  3. 3Toxic gas accumulation is measured, integrated commands are sent to ventilation systems.

Proposed hardware

  • Multi Gas Spectrometer
  • Corrosion Scanner Optical Camera
  • IP67 Sealed Housing

Proposed software

Navigation
Lidar-based 3D mapping in dark and narrow holds
Model
Hazardous Substance Leak and Corrosion Segmentation
Integration
Ship Fleet Management and OHS Systems (Offline-to-Online)

The robot's real operating limits

Unitree A2

Unitree A2

Industrial Class Legged Robot

Product page
Ingress rating
IP56-IP67
Runtime
>5 hours (No load) / >3 hours (25kg Load)
Operating temperature
-20°C to 55°C
Payload
100 kg
Max speed
5 m/s
Climb
45°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.