Skip to content
Robotlar
Concept scenario

Escalator Mechanical Fault Sound Early Detection

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Indoor, public area
Operating mode
Supervised autonomy
Proposed robot
Unitree AS2

The problem addressed

Escalator faults only detected during periodic maintenance (monthly) and accidents occurring in between.

Draft mission flow

  1. 1The robot stops at the start and end of each escalator, collecting 10-second acoustic and vibration data.
  2. 2AI classifies abnormal squeaking, knocking, and wear sounds by comparing motor, gearbox, and chain sounds against reference baseline.
  3. 3Each escalator assigned a 'health score'; automatic service call opened with maintenance company when score drops.
  4. 4Escalator shutdown recommendation transmitted to facility management when sudden breakdown risk detected; accident risks eliminated.

Proposed hardware

  • Ultrasonic Microphone Array
  • Vibration Accelerometer
  • HD Optical Camera
  • NVIDIA Jetson Orin NX

Proposed software

Navigation
SLAM with positioning at escalator start and end points
Model
Escalator Motor, Gear and Chain Sound Frequency Analysis; Wear Score Calculation
Integration
Mall Facility Management and Escalator Maintenance Service Company API

The robot's real operating limits

Unitree AS2

Unitree AS2

Industrial Capacity in a Compact Chassis

Product page
Ingress rating
IP54
Runtime
>4 hours (No load)
Operating temperature
-20°C to 50°C
Payload
Up to 65 kg
Max speed
>5 m/s
Climb
40°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.