Skip to content
Robotlar
Concept scenario

Escalator & Elevator Fault Early Warning System

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Indoor, public area
Operating mode
Supervised autonomy
Proposed robot
Unitree AS2

The problem addressed

Escalator and elevator breakdowns stranding customers and creating safety risks.

Draft mission flow

  1. 1Robot visits each escalator and elevator 3 times daily; performs mechanical health scan with vibration sensor and acoustic microphone.
  2. 2Thermal camera detects overheating in motors and gearboxes; anomalies outside normal profiles are reported.
  3. 3Worn step surfaces, broken handrails, and objects posing entrapment risk identified by camera.
  4. 4Maintenance priority queue created for high-risk equipment; automatic stop command sent in emergencies.

Proposed hardware

  • Vibration Sensor
  • Thermal Camera
  • Acoustic Emission Microphone
  • HD Camera
  • 2D LiDAR

Proposed software

Navigation
Multi-floor patrol navigation using elevators between mall floors
Model
Mechanical Anomaly Detection (Vibration FFT Analysis), Thermal Hotspot Classification, and Sound Signature Matching
Integration
Mall Maintenance & Repair Work Order System (CMMS) and Elevator/Escalator Manufacturer API

The robot's real operating limits

Unitree AS2

Unitree AS2

Industrial Capacity in a Compact Chassis

Product page
Ingress rating
IP54
Runtime
>4 hours (No load)
Operating temperature
-20°C to 50°C
Payload
Up to 65 kg
Max speed
>5 m/s
Climb
40°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.