Skip to content
Robotlar
Concept scenario

HVAC Comfort Real-Time Monitoring

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Indoor, public area
Operating mode
Supervised autonomy
Proposed robot
Unitree AS2

The problem addressed

Some mall zones being excessively cold, others suffocatingly hot: the 2nd most common customer complaint.

Draft mission flow

  1. 1Robot circulates different mall zones measuring temperature, humidity, CO2 and PM2.5 values at each point.
  2. 2Thermal camera creates cold/hot zone map; CO2 accumulation detected in crowded areas.
  3. 3When PMV/PPD comfort index is out of threshold, automatic HVAC adjustment recommendation sent to BMS.
  4. 4Zonal comfort maps and trend reports presented to mall management; settings adjusted before complaint-heavy hours.

Proposed hardware

  • Temperature/Humidity Sensor
  • CO2 Sensor
  • PM2.5 Particle Sensor
  • Airflow Speed Sensor
  • Thermal Camera

Proposed software

Navigation
Adaptive routing based on crowd density in mall open areas and store corridors
Model
Thermal Comfort Index (PMV/PPD) Calculation and Zonal Air Quality Mapping
Integration
BMS (Building Management System) HVAC Control Panel and Mall Operations Dashboard

The robot's real operating limits

Unitree AS2

Unitree AS2

Industrial Capacity in a Compact Chassis

Product page
Ingress rating
IP54
Runtime
>4 hours (No load)
Operating temperature
-20°C to 50°C
Payload
Up to 65 kg
Max speed
>5 m/s
Climb
40°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.