Skip to content
Robotlar
Concept scenario

Wet/Slippery Floor Detection & Instant Alert System

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Indoor, public area
Operating mode
Supervised autonomy
Proposed robot
Unitree AS2

The problem addressed

Fall accidents from wet floors, insurance lawsuits, and customer injuries.

Draft mission flow

  1. 1Robot detects wet/slippery areas from abnormal brightness and humidity values on floor surface during patrol.
  2. 2Warning symbol projected onto hazardous zone's floor via LED projector; audio warning given through speaker.
  3. 3Automatic task assigned to cleaning crew with instant location and spillage type (water/oil/food) information.
  4. 4Each slip risk event recorded with timestamp and photo; creates evidence for insurance claims.

Proposed hardware

  • Humidity Sensor (Near Floor)
  • HD Camera
  • 3D LiDAR
  • LED Warning Projector
  • Speaker

Proposed software

Navigation
Continuous patrol in mall common areas and event-based emergency redirect navigation
Model
Wet Floor Reflectance Analysis, Spillage Classification, and Slip Risk Score Calculation
Integration
Mall Cleaning Management System and Insurance Incident Record Database

The robot's real operating limits

Unitree AS2

Unitree AS2

Industrial Capacity in a Compact Chassis

Product page
Ingress rating
IP54
Runtime
>4 hours (No load)
Operating temperature
-20°C to 50°C
Payload
Up to 65 kg
Max speed
>5 m/s
Climb
40°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.