Skip to content
Robotlar
Concept scenario

Children's Play Area Safety & Hygiene Inspection Robot

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Indoor, public area
Operating mode
Supervised autonomy
Proposed robot
PUDU CC1 Pro

The problem addressed

Hygiene inadequacy, broken equipment, and injury risk in children's play areas; #1 source of parent concern.

Draft mission flow

  1. 1Robot scans play area before opening and every 2 hours; detects broken, sharp-edged, or damaged equipment.
  2. 2UV fluorescence module maps invisible contamination (body fluids, food residue) on surfaces.
  3. 3Hygiene and safety score generated for equipment like ball pit, slides, and climbing walls.
  4. 4Critical finding triggers automatic temporary closure recommendation and maintenance request for play area.

Proposed hardware

  • HD Camera
  • UV Fluorescence Module
  • Odor Sensor
  • Impact/Softness Sensor
  • Humidity Sensor

Proposed software

Navigation
Slow and careful navigation avoiding children within play area boundaries
Model
Broken/Sharp Edge Detection, Surface Bacteria Risk UV Analysis, and Toy Integrity Check
Integration
Mall Play Area Management System and Parent Information Panel

The robot's real operating limits

PUDU CC1 Pro

PUDU CC1 Pro

Otonom Temizlik Robotu

Product page
Runtime
Washing: 5h, Sweeping: 5h, Carpet: 4h, Mop: 9h
Payload
15L Clean / 15L Dirty Water Capacity
Max speed
0.2 m/s ~ 1.2 m/s (Adjustable)
Weight
75

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.