Concept scenario

Electrical Panel Temperature & Arc Fault Early Warning

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Teleoperation
Proposed robot
Unitree A2

The problem addressed

Electrical panel fires: the most devastating and costly incident type in malls.

Draft mission flow

  1. 1Robot scans electrical panels 3 times daily with thermal camera; temperature rises at terminals, fuses, and connection points mapped.
  2. 2Arc fault indicators (momentary light, crackling sound, ozone smell) detected via multi-sensor fusion.
  3. 3Automatic emergency shutdown recommendation and electrician call triggered for panels exceeding alarm threshold.
  4. 4Future period capacity overload predicted with seasonal load increase trends; proactive reinforcement recommended.

Proposed hardware

  • Thermal Camera
  • Arc Detection Sensor
  • Electromagnetic Field Meter
  • HD Camera
  • Smoke Sensor

Proposed software

Navigation
Technical corridor navigation between mall electrical distribution rooms and main panel locations
Model
Panel Thermal Profile Anomaly Detection, Arc-Induced Sound/Light Recognition, and Cable Overload Estimation
Integration
Mall Electrical Safety System and Fire Department Early Warning Protocol

The robot's real operating limits

Unitree A2

Unitree A2

Industrial Class Legged Robot

Product page
Ingress rating
IP56-IP67
Runtime
>5 hours (No load) / >3 hours (25kg Load)
Operating temperature
-20°C to 55°C
Payload
100 kg
Max speed
5 m/s
Climb
45°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.