Stack Gas Emission Measurement and Environmental Compliance Reporting

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Teleoperation
Proposed robot
Unitree A2

The problem addressed

Maintenance cost of fixed emission monitors and penalty risks from intermittent measurement.

Draft mission flow

  1. 1The robot positions on a safe platform near the stack outlet; measures SO₂, NOₓ, CO, and particulate emissions with gas analyzer.
  2. 2Emission dispersion model created by correlating with wind direction and speed.
  3. 3Early warning sent to process control system when emission values approach legal limit; combustion parameters optimized.
  4. 4Continuous data transmitted in format compatible with ministry emission monitoring network; monthly compliance report auto-generated.

Proposed hardware

  • Multi-Gas Analyzer (SO₂/NOₓ/CO/PM)
  • HD Optical Camera
  • Wind Sensor
  • LiDAR L2

Proposed software

Navigation
Safe edge SLAM navigation on stack perimeter platform
Model
Emission Concentration Trend Prediction and Legal Limit Exceedance Early Warning
Integration
Ministry of Environment Emission Monitoring Network and Factory Process Control

The robot's real operating limits

Unitree A2

Unitree A2

Industrial Class Legged Robot

Product page
Ingress rating
IP56-IP67
Runtime
>5 hours (No load) / >3 hours (25kg Load)
Operating temperature
-20°C to 55°C
Payload
100 kg
Max speed
5 m/s
Climb
45°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.