Skip to content
Robotlar
Concept scenario

Outdoor Concert Venue Decibel and Noise Mapping

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Supervised autonomy
Proposed robot
Unitree A2

The problem addressed

Noise pollution at outdoor events causing neighborhood complaints and legal penalties.

Draft mission flow

  1. 1The robot patrols autonomously before and during the concert around the venue and neighboring residential areas; measures sound levels.
  2. 2Analyzes sound source direction and frequency profile with directional microphone; creates 3D noise propagation map.
  3. 3Sends real-time warning to sound system control desk when approaching legal noise limit.
  4. 4Compliance report produced for municipal environmental measurement network; post-event noise compliance certificate prepared.

Proposed hardware

  • Calibrated Sound Level Meter (dBA/dBC)
  • Directional Microphone Array
  • RTK-GPS
  • WiFi 6E

Proposed software

Navigation
Autonomous noise measurement patrol around concert venue and neighboring residential areas
Model
3D Noise Propagation Map and Legal Limit Exceedance Prediction
Integration
Municipal Environmental Measurement Network and Event Sound System Control

The robot's real operating limits

Unitree A2

Unitree A2

Industrial robot dog: 100 kg static payload

Product page
Ingress rating
IP56-IP67
Runtime
>5 hours (No load) / >3 hours (25kg Load)
Operating temperature
-20°C to 55°C
Payload
100 kg
Max speed
5 m/s
Climb
45°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.