Skip to content
Robotlar
Concept scenario

Municipal Park Night Security and Vandalism Prevention

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Supervised autonomy
Proposed robot
Unitree A2

The problem addressed

Vandalism, environmental destruction, and security threats in parks during nighttime hours.

Draft mission flow

  1. 1The robot patrols autonomously in park areas throughout the night; detects vandalism acts with thermal and night vision camera.
  2. 2Behaviors like spray painting, bench/lighting breaking or flower bed destruction detected by AI.
  3. 3Deterrent alarm with siren and LED strobe when vandalism detected; live footage transmitted to enforcement center.
  4. 4Night patrol summary and damage report presented to municipal parks directorate in the morning.

Proposed hardware

  • Radiometric Thermal Camera
  • HD Night Vision Camera
  • High Decibel Siren
  • LED Strobe

Proposed software

Navigation
Night autonomous patrol SLAM on park walkways and playgrounds
Model
Vandalism Behavior Detection (Spray Painting, Breaking, Removal) and Suspicious Gathering Analysis
Integration
Municipal Enforcement Center and Smart City Security Platform

The robot's real operating limits

Unitree A2

Unitree A2

Industrial robot dog: 100 kg static payload

Product page
Ingress rating
IP56-IP67
Runtime
>5 hours (No load) / >3 hours (25kg Load)
Operating temperature
-20°C to 55°C
Payload
100 kg
Max speed
5 m/s
Climb
45°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.