Concept scenario

Cargo Package Drop/Crush Damage Analysis

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Indoor, public area
Operating mode
Supervised autonomy
Proposed robot
Unitree AS2

The problem addressed

Return costs, brand reputation loss and delivery-quality failures from damaged packages reaching customers.

Draft mission flow

  1. 1The robot patrols autonomously at conveyor belt exit and sortation area; instantly detects packages that fall off the belt or are incorrectly transferred.
  2. 2Classifies crushing, tearing, and deformation on package surfaces with HD camera; identifies product with barcode reader.
  3. 3Damaged packages automatically directed to quarantine zone; customer order updated with 'damage' status in OMS.
  4. 4Damage pattern and location analysis identifies recurring breakage points; operations improvement report generated.

Proposed hardware

  • HD RGB Camera
  • 3D Depth Camera
  • NVIDIA Jetson Orin NX
  • Barcode/QR Reader

Proposed software

Navigation
Dynamic SLAM navigation at conveyor belt exit and sortation area
Model
Package Surface Deformation and Crush Classification (ResNet + 3D Mesh Comparison)
Integration
OMS (Order Management System) and Customer Damage Reporting Portal

The robot's real operating limits

Unitree AS2

Unitree AS2

Compact industrial robot dog

Product page
Ingress rating
IP54
Runtime
>4 hours (No load)
Operating temperature
-20°C to 50°C
Payload
Up to 65 kg
Max speed
>5 m/s
Climb
40°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.