Restroom Hygiene and Odor Level Monitoring
Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.
- Environment
- Indoor, public area
- Operating mode
- Supervised autonomy
- Proposed robot
- PUDU CC1 Pro
The problem addressed
Quality control of mall restroom hygiene limited to hourly manual inspection and customer complaints.
Draft mission flow
- 1The robot enters restrooms at hourly intervals; measures odor intensity with NH₃ and VOC sensors, floor wetness with humidity sensor.
- 2Evaluates paper towel fill level, soap dispenser level, and overall visual hygiene status with HD camera.
- 3All data combined to assign each restroom a 'hygiene score'; automatic task assigned to cleaning crew when score drops below threshold.
- 4Passive sterilization performed between restroom visits with UV-C module; hygiene history reported to suggest cleaning optimization for peak hours.
Proposed hardware
- VOC/NH₃ Odor Sensor
- Humidity/Temperature Sensor
- HD Camera
- UV-C Sterilization Module
Proposed software
- Navigation
- Compact maneuvering SLAM in restroom areas; entry-exit door transitions
- Model
- Hygiene Scoring (Odor + Humidity + Visual Contamination Correlation)
- Integration
- Mall Facility Management and Cleaning Crew Task System
The robot's real operating limits

PUDU CC1 Pro
Autonomous Cleaning Robot
Product page- Runtime
- Washing: 5h, Sweeping: 5h, Carpet: 4h, Mop: 9h
- Payload
- 15L Clean / 15L Dirty Water Capacity
- Max speed
- 0.2 m/s ~ 1.2 m/s (Adjustable)
- Weight
- 75
Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.
From scenario to installation
Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.