Skip to content
Robotlar
Concept scenario

Wet/Slippery Floor Detection and On-Site Warning

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Indoor, public area
Operating mode
Supervised autonomy
Proposed robot
Unitree AS2

The problem addressed

Customer slip accidents due to late detection of wet floors and failure to place warning signs.

Draft mission flow

  1. 1The robot continuously scans floors in mall corridors; detects wet or slippery areas with moisture sensor and camera.
  2. 2Robot takes standing position at detected wet area; gives 'Caution: Wet Floor' warning with LED warning lights and speaker.
  3. 3Instant coordinates and photo notification sent to cleaning crew; robot continues warning duty in the area until cleaning is completed.
  4. 4Daily floor safety report generated; most frequently wet areas analyzed and permanent solution recommendations presented.

Proposed hardware

  • Moisture Detection Sensor (Floor Surface)
  • HD Camera
  • LED Warning Lights
  • Speaker

Proposed software

Navigation
Continuous floor scanning patrol in mall corridors; adaptive speed slowing in wet zones
Model
Floor Wet/Dry Segmentation and Slipperiness Risk Score Calculation
Integration
Mall Facility Management and Cleaning Crew Notification System

The robot's real operating limits

Unitree AS2

Unitree AS2

Industrial Capacity in a Compact Chassis

Product page
Ingress rating
IP54
Runtime
>4 hours (No load)
Operating temperature
-20°C to 50°C
Payload
Up to 65 kg
Max speed
>5 m/s
Climb
40°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.