Skip to content
Robotlar
Concept scenario

Rainwater Leak & Ceiling Drip Early Detection

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Indoor, public area
Operating mode
Supervised autonomy
Proposed robot
Unitree AS2

The problem addressed

Water dripping inside mall during rainy weather, slippery floors, and ceiling damage risk.

Draft mission flow

  1. 1Robot scans mall ceilings with thermal and multispectral cameras; detects moisture accumulation and water stains.
  2. 2Swelling, discoloration, and drip marks on ceiling panels visually classified.
  3. 3Pre and post-rainfall comparative scans map leak points with exact coordinates.
  4. 4Repair requests automatically created for maintenance team by urgency order; preventive intervention before customer-facing drips.

Proposed hardware

  • Thermal Camera
  • Humidity Sensor
  • Multispectral Camera
  • HD Zoom Camera
  • 3D LiDAR

Proposed software

Navigation
Ceiling scanning route with upward-facing camera angle in mall under-ceiling areas
Model
Ceiling Water Stain Detection, Humidity Anomaly Mapping, and Structural Deterioration Classification
Integration
Mall Facility Maintenance System (CMMS) and Structural Safety Monitoring Platform

The robot's real operating limits

Unitree AS2

Unitree AS2

Compact industrial robot dog

Product page
Ingress rating
IP54
Runtime
>4 hours (No load)
Operating temperature
-20°C to 50°C
Payload
Up to 65 kg
Max speed
>5 m/s
Climb
40°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.