Parking Garage Ventilation & Exhaust Gas Quality Monitoring

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Indoor, public area
Operating mode
Supervised autonomy
Proposed robot
Unitree AS2

The problem addressed

Suffocating exhaust gas accumulation, dizziness complaints, and health risks in parking floors.

Draft mission flow

  1. 1Robot circulates parking floors with grid scanning measuring CO, NO2 and PM10 concentrations at each point.
  2. 2Ventilation fan airflow speed and direction verified; non-functional or inefficient fans detected.
  3. 3When toxic gas threshold exceeded, emergency fan boost and entry prohibition automatically triggered.
  4. 4Hourly air quality map and trend analysis determines safe usage hours for parking floors.

Proposed hardware

  • CO Sensor
  • NO2 Sensor
  • PM10 Particle Sensor
  • Airflow Sensor
  • Thermal Camera

Proposed software

Navigation
Multi-floor navigation with ramp transitions and gas measurement grid route in parking levels
Model
Toxic Gas Concentration Mapping, Ventilation Inefficiency Detection, and Emergency Alarm Threshold
Integration
BMS HVAC Parking Fan Control System and OHS Emergency Response Protocol

The robot's real operating limits

Unitree AS2

Unitree AS2

Compact industrial robot dog

Product page
Ingress rating
IP54
Runtime
>4 hours (No load)
Operating temperature
-20°C to 50°C
Payload
Up to 65 kg
Max speed
>5 m/s
Climb
40°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.