Operational
Mechanism.
Technical details of field integration, data flow, and autonomous decision algorithms.
Edge Hardware
Artificial Intelligence
Navigation (SLAM)
Route planning integrated with BIM model (Building Information Modeling)
Perception & Analysis
Point Cloud Processing and Tolerance Error Detection
Autonomous Workflow
The robot autonomously traverses construction site floors during the night shift and generates a 3D point cloud map.
This up-to-date map is automatically overlaid with the actual BIM project (digital drawing) of the construction.
Errors such as column deviations or incorrect wall constructions are detected and reported with millimetric precision.
Operational ROI.
Strategic Decision.
Annual $46,000 'Rework' cost prevention. ROI: 2.4x
Zeros out 'Rework' processes of breaking and re-pouring incorrectly poured concrete.
Example modelling — not realised customer data. Calculated assuming roughly $20,000 total investment (robot, integration and commissioning); actual results vary by facility, shift count and configuration. Request a quote for a calculation specific to your organisation.
Review Your Custom
Autonomous Operation
Plan On-Site.
Our engineers are ready to present this robotic integration plan, specially simulated for your facility, to your team. Let's confidently launch your business's digital transformation.
