Concept scenario

Construction Site Raw Construction Autonomous BIM Mapping and Progress Control

Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.

Environment
Outdoor field
Operating mode
Supervised autonomy
Proposed robot
Unitree A2

The problem addressed

Massive demolition costs caused by faulty manufacturing noticed late as construction progresses.

Draft mission flow

  1. 1The robot autonomously traverses construction site floors during the night shift and generates a 3D point cloud map.
  2. 2This up-to-date map is automatically overlaid with the actual BIM project (digital drawing) of the construction.
  3. 3Errors such as column deviations or incorrect wall constructions are detected and reported with millimetric precision.

Proposed hardware

  • 360 Degree Spherical 3D LiDAR
  • RGB Depth Camera
  • High Precision IMU

Proposed software

Navigation
Route planning integrated with BIM model (Building Information Modeling)
Model
Point Cloud Processing and Tolerance Error Detection
Integration
Autodesk Revit or Procore API Integration

The robot's real operating limits

Unitree A2

Unitree A2

Industrial robot dog: 100 kg static payload

Product page
Ingress rating
IP56-IP67
Runtime
>5 hours (No load) / >3 hours (25kg Load)
Operating temperature
-20°C to 55°C
Payload
100 kg
Max speed
5 m/s
Climb
45°

Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.

From scenario to installation

Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.