Concept scenario
City Asphalt Crack Mapping and Infrastructure Inspection
Scenario record: it defines the environment, the mission flow and a proposed hardware and software configuration. The list below is a configuration proposal, not an installation inventory. Field projects lists deployed systems and their measurements.
- Environment
- Outdoor field
- Operating mode
- Supervised autonomy
- Proposed robot
- Unitree A2
The problem addressed
Time loss and large asphalt collapses created by reactive (complaint-based) road repairs.
Draft mission flow
- 1The wheeled robot travels on sidewalks or low-density roads without blocking pedestrian traffic.
- 2It detects even 2 mm cracks on the surface with optical models and adds coordinate and depth tags.
- 3An automatic patch and repair work order is opened for municipal teams.
Proposed hardware
- High Resolution Optical Profilometer
- RTK GPS
- NVIDIA Orin NX Edge AI
Proposed software
- Navigation
- Long-range driving in wheeled mode on city roads and sidewalks
- Model
- Asphalt Wear, Pothole and Aggregate Degradation Segmentation
- Integration
- Municipal GIS and Infrastructure Maintenance Systems
The robot's real operating limits

Unitree A2
Industrial Class Legged Robot
Product page- Ingress rating
- IP56-IP67
- Runtime
- >5 hours (No load) / >3 hours (25kg Load)
- Operating temperature
- -20°C to 55°C
- Payload
- 100 kg
- Max speed
- 5 m/s
- Climb
- 45°
Values are manufacturer data. Scenario fit is determined by comparing these limits with site conditions.
From scenario to installation
Feasibility is determined by the site survey: floor and route, network coverage, the charging point, intervention responsibilities and the conditions under which the robot must stop. The survey report defines the scope, the constraints and the commissioning steps.






























































